Changelog

De laatste updates en verbeteringen van Travas. De changelog is beschikbaar in het Engels.

29 juli 2026

  • Annex VII documents can now be deleted and duplicated
  • Cookie consent banner in the app

28 juli 2026

  • The transport date in emails is now labeled as the date of transport
  • A warning is shown when transport is scheduled before it is allowed

27 juli 2026

  • Replaced a placeholder in the declaration text
  • Checkout now redirects to the billing details form when required billing information is missing

24 juli 2026

  • Replace a carrier on a locked Annex VII — When the shipment hasn’t started yet, the carrier can now be replaced without editing the annex: the old carrier’s transport link stops working immediately and the new carrier receives a fresh invitation to sign Block 5. Successive (non-executing) carriers can be replaced, added or removed in the same window. Once Block 5 is signed, the carrier list is fixed.
  • Cancel an Annex VII — A locked Annex VII that hasn’t started moving can now be cancelled by the arranger. The shipment is called off, open carrier actions are closed, and the carrier’s transport link stops working.
  • Public changelog — This page! All product updates are now published at /changelog.
  • Responsible disclosure — A public security policy at /responsible-disclosure and a machine-readable security.txt, including an OpenPGP key for encrypted vulnerability reports.

23 juli 2026

  • Prices always shown in Euros — Fixed a localization issue where amounts could render in a non-Euro currency format; all prices now consistently display in Euros.

21 juli 2026

  • Border crossing suggestions on the project form — The specific entry/exit points (Block 15) now suggest official border crossings while you type, filtered by the countries on the route and the transport mode. Picking a point automatically fills in the matching point on the other side of the border (e.g. choosing exit “Venlo (A67)” fills entry “Straelen (A40/E34)” and the transit country). Free-text entries remain possible; a hint under each field says so.
  • “How will the transport take place?” — New transport-mode field on the project (road, rail, sea, air, inland waterways), which also drives the border-crossing suggestions.
  • Clearer route layout — The export country, transit countries and import country each render as their own card on the project form, with equal-width fields.
  • Back to search when adding an organization manually — When entering an organization by hand, a new link takes you back to the organization search.
  • “Projects as importer” tab restricted — The importer tab is now only shown to (and reachable by) organizations that actually act as importer; organizations merely referenced on a project (e.g. as carrier) no longer see it.
  • VAT number validation for foreign organizations — VAT numbers of organizations outside the Netherlands are now validated too.
  • Subscription management permissions fixed — Corrected who can view and manage the organization’s subscription.

17 juli 2026

  • Shared shipment details moved to the project — Waste identification, waste description, the countries/states concerned and the involved parties are now filled in once on the project and shared by all its annexes, instead of being repeated on every annex form.
  • Transfer-location step removed — The extra transfer-location stop in the transport flow, including its sign-for-receipt step and email invitation, has been removed.

14 juli 2026

  • Structured transit countries on Annex 1A — Block 15 transit countries are now proper entries with their own competent authority and entry/exit points, instead of free-form fields.
  • One-time payment for assisted DiWaSS connection — The assisted DiWaSS connection during onboarding is now offered as a one-time payment.

13 juli 2026

  • Online payments via Stripe — Subscriptions are now handled through Stripe, including the payment step during onboarding and subscription management for the organization.
  • Localized prices — Amounts in the onboarding flow are now shown in the localized currency format.

9 juli 2026

  • Transport dates: date_of_transport is now only required for movement documents (Annex VII / 1B), not for Annex 1A notifications.
  • Clearer confirmation in the loading screen that a file has been uploaded.

8 juli 2026

  • The in-transit screen now includes download buttons for the CMR and Annex VII, so drivers can view them offline.
  • CMR preview added to the unloading screen.
  • Download the complete transport dossier from the completed-transport screen.
  • A carrier who is also the driver keeps access to the transport link/screens through the driver flow.

7 juli 2026

  • Projects can no longer be edited once locked (an annex has been signed/submitted).
  • Duplicate organizations are prevented during onboarding — nudges on near-matches and blocking on an exact match.
  • New CMR preview button and repositioned CMR signature.
  • Fixed images collapsing by giving uploads a unique filename.

6 juli 2026

  • Documents: clear an uploaded file from a document.
  • Annex labels now show their position as (n / total).
  • Team invites: members can now invite other members and readers (owners invite owners and readers).
  • Search your projects by name on the organization page.
  • Small pricing display corrections and DIWASS operator-status fix.

3 juli 2026

  • Transports are now ordered by most recent.
  • Transport details show the correct loaded amount.

2 juli 2026

  • Declare/handling form autofills the received amount and now accepts decimals.
  • Deadlines account for working days and public holidays.

30 juni 2026

  • Add a transfer location as an extra step in the transport flow.
  • Download & print Annex VII documents.
  • The drivers form is skipped when the carrier is also the driver.
  • Annexes are saved as a draft before strict validation, so you no longer lose progress on save.
  • Welcome email sent to new users.

24 juni 2026

  • Annex VII updated to the May 2026 version.

23 juni 2026

  • Annex 1b preview.

19 juni 2026

  • New green list transfer contract.

18 juni 2026

  • Handler and waste producer fields added to projects.
  • Already signed-in users are redirected away from the signup/login pages.

16 juni 2026

  • Annex 1b submission to DIWASS.
  • Capture the address from which the transport starts (block 3.1).
  • EORI, VAT and Global Location Number validations.
  • Fixed the wrong organization being selected during onboarding.
  • Prevented unclaimed organizations from being edited during onboarding.

15 juni 2026

  • Clarified why the establishment number is required.
  • Upload documents when creating a submission request.
  • Multiple small fixes: PDF generation, localized dates in annex previews, dead manual-guide links, tighter authorization on the project view, Dutch postal codes in DIWASS, German CMR freight-slip translation, and removal of an unused special-handling field.

12 juni 2026

  • Fixed DIWASS name search when multiple results are returned.

11 juni 2026

  • Fixed the wrong CA code when creating an operator in DIWASS.

10 juni 2026

  • Completed actions now move to a “completed” tab once checked off.
  • Emphasized company details in the assisted DIWASS setup.
  • Fixed the wrong company name and email errors in driver emails.

9 juni 2026

  • Fixed handling of DIWASS operator addresses returned as an array.

8 juni 2026

  • Multiple small fixes: EC-list codes and Annex 1a block 15.

5 juni 2026

  • Receive and respond to Requests for Information from competent authorities on your notifications.

4 juni 2026

  • Ask for ship name and registration on sea transport (mode C).

2 juni 2026

  • Transport documents are automatically attached to the Annex VII on upload.
  • Submitted Annex VII can no longer be edited.
  • Actions are sent only to the actual carrier, not all carriers.